Inspection
Kai · Product specialist · 29 s
At every handover, describe the spaces again, store photos separately and later gather meter readings, keys and comments. Explore how the intended workflow keeps the work together. This is an explanatory scenario, not a functioning customer environment.
You select the rental unit, inspection date and people involved.
The permitted property and contract data form the starting point.
No second rental or building file.
You select existing spaces or add to the structure; you record condition, inventory and photos.
Each new finding remains linked to the correct item. Anything not checked remains identifiable.
An organised initial condition, without presenting old photos or statuses as a new inspection.
You record meter readings, keys and responses and review the draft version.
The information is linked to this inspection. The report and signature status follow their own version.
It is clear what is recorded, what is still missing and who still needs to respond.
You create a new inspection and compare the same spaces and inventory.
The initial condition remains alongside the final condition; missing evidence remains visible.
Identify differences without assigning blame or costs in advance.
You decide which item is followed up and who reviews the repair.
The task, repair evidence and reinspection refer back to the original finding.
Separate moments, one traceable history.
Automation remains dependent on configuration and available features. No real message, document or instruction is processed here.

Inspections
Product specialist
Calls and live chat are not available yet. Contact us for more information.
Contact usKai · Product specialist · 29 s
ObraPad is designed to keep Obra Core as the shared foundation while you add capabilities over time.
Building-specific activation and restricted installer access are being prepared for the pilot and verified end to end. Ask which scopes can currently be tested.
The pilot direction is to begin with one workspace and add more later.
The planned flow activates Construction only for the building being renovated; other buildings stay unchanged.
The access model is being developed so an installer or partner can use only the selected building, installation or task.
In the intended scenario, the installer only accesses the heat pump, its documents and assigned maintenance tasks in one building. Other buildings, financial information and private documents remain outside the scope. View, change, duration and revocation controls must be proven server-side before availability.
The design keeps an additional workspace and partner access as separate choices, with the building passport as the shared foundation.