HomeWorkspacesConstruction & handover
A working day with Construction & handover · illustrative scenario

You do your work.
The context stays with you.

After a site walk, sort photos, type up comments, translate messages and explain separately to contractors where the issue is. Explore how the intended workflow keeps the work together. This is an explanatory scenario, not a functioning customer environment.

01Site walk with voice and photosPlanned AI processing
YOUR ACTION

The architect selects the living room and project, dictates an inspection point and links photo references.

THE SOFTWARE HELPS

The intended voice flow retains a verifiable transcript with source and space context.

WHAT THIS DELIVERS

No separate note without a location or associated photo.

02From source to draft reportAI proposal · planned
YOUR ACTION

The architect confirms the transcript and photo links.

THE SOFTWARE HELPS

AI prepares observations, action points, roles and deadlines. Uncertainty remains uncertain.

WHAT THIS DELIVERS

A draft ready for discussion instead of starting the report from scratch.

03Clear tasks for the right roleConfirmation + project rules
YOUR ACTION

The authorised user confirms the clear actions and checks the deadlines.

THE SOFTWARE HELPS

The available assignment flow uses approved project roles and rules. Extensive automatic assignment requires separate development.

WHAT THIS DELIVERS

Follow-up without retyping every task.

04Contractor reads in their own languageConfiguration-dependent translation
YOUR ACTION

The contractor opens the task, photo and source plan in their preferred language.

THE SOFTWARE HELPS

The translated view and the original refer to the same agreement and revision.

WHAT THIS DELIVERS

No parallel task or separate translation conversation.

05Check the plan position on siteAR Set-out · planned
YOUR ACTION

The installer opens SP-LIV-02 with the reference dimensions according to the plan.

THE SOFTWARE HELPS

The AR roadmap may project the intended position in the space after alignment and verification. This demo provides no measurement assurance.

WHAT THIS DELIVERS

Understand where the work belongs; execution and technical inspection remain separate statuses.

Less reporting, searching and chasing. More visibility into agreements and costs.

Automation remains dependent on configuration and available features. No real message, document or instruction is processed here.

View all features

Meet Lucas

Construction

A plan becomes a building. Its information grows with it.

Explore a practical example
Lucas

Lucas

Construction

Product specialist

Contact us

Watch the practical example

Pilot direction: start with one workspace and expand later.

ObraPad is designed to keep Obra Core as the shared foundation while you add capabilities over time.

Building-specific activation and restricted installer access are being prepared for the pilot and verified end to end. Ask which scopes can currently be tested.

Intended starting point

The pilot direction is to begin with one workspace and add more later.

Planned per-building expansion

The planned flow activates Construction only for the building being renovated; other buildings stay unchanged.

Planned access model

The access model is being developed so an installer or partner can use only the selected building, installation or task.

Intended example: heat pump maintenance

In the intended scenario, the installer only accesses the heat pump, its documents and assigned maintenance tasks in one building. Other buildings, financial information and private documents remain outside the scope. View, change, duration and revocation controls must be proven server-side before availability.

The design keeps an additional workspace and partner access as separate choices, with the building passport as the shared foundation.

Help me choose