Construction
Lucas · Product specialist · 36 s
After a site walk, sort photos, type up comments, translate messages and explain separately to contractors where the issue is. Explore how the intended workflow keeps the work together. This is an explanatory scenario, not a functioning customer environment.
The architect selects the living room and project, dictates an inspection point and links photo references.
The intended voice flow retains a verifiable transcript with source and space context.
No separate note without a location or associated photo.
The architect confirms the transcript and photo links.
AI prepares observations, action points, roles and deadlines. Uncertainty remains uncertain.
A draft ready for discussion instead of starting the report from scratch.
The authorised user confirms the clear actions and checks the deadlines.
The available assignment flow uses approved project roles and rules. Extensive automatic assignment requires separate development.
Follow-up without retyping every task.
The contractor opens the task, photo and source plan in their preferred language.
The translated view and the original refer to the same agreement and revision.
No parallel task or separate translation conversation.
The installer opens SP-LIV-02 with the reference dimensions according to the plan.
The AR roadmap may project the intended position in the space after alignment and verification. This demo provides no measurement assurance.
Understand where the work belongs; execution and technical inspection remain separate statuses.
Automation remains dependent on configuration and available features. No real message, document or instruction is processed here.
Meet Lucas
A plan becomes a building. Its information grows with it.
Explore a practical example
Construction
Product specialist
Calls and live chat are not available yet. Contact us for more information.
Contact usLucas · Product specialist · 36 s
ObraPad is designed to keep Obra Core as the shared foundation while you add capabilities over time.
Building-specific activation and restricted installer access are being prepared for the pilot and verified end to end. Ask which scopes can currently be tested.
The pilot direction is to begin with one workspace and add more later.
The planned flow activates Construction only for the building being renovated; other buildings stay unchanged.
The access model is being developed so an installer or partner can use only the selected building, installation or task.
In the intended scenario, the installer only accesses the heat pump, its documents and assigned maintenance tasks in one building. Other buildings, financial information and private documents remain outside the scope. View, change, duration and revocation controls must be proven server-side before availability.
The design keeps an additional workspace and partner access as separate choices, with the building passport as the shared foundation.